IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,299

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0402 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $116 $158 Implemented
IA0402 # 07 Y:2007 07 2007 COVER OPEN TANKS $6,793 $599 Implemented
IA0402 # 08 Y:2007 08 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $229 $137 Implemented
IA0402 # 09 Y:2007 09 2007 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $765 $667 Implemented
IA0402 # 10 Y:2007 10 2007 INSULATE BARE EQUIPMENT $2,271 $3,989 Not Implemented
IA0402 # 11 Y:2007 11 2007 REDUCE VENTILATION AIR $38,317 $10,141 Implemented
IA0402 # 12 Y:2007 12 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,070 $3,770 Implemented
IA0396 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $781 $25 Not Implemented
IA0396 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,228 $600 Implemented
IA0396 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $302 $3,899 Implemented
IA0396 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,836 $4,661 Implemented
IA0396 # 05 Y:2006 05 2006 DISCONNECT BALLASTS $810 $83 Implemented
IA0396 # 06 Y:2006 06 2006 HEAT WATER WITH EXHAUST HEAT $57,298 $18,000 Not Implemented
IA0396 # 07 Y:2006 07 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $6,338 $500 Implemented
IA0396 # 08 Y:2006 08 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,234 $1,702 Implemented
IA0396 # 09 Y:2006 09 2006 USE MINIMUM STEAM OPERATING PRESSURE $2,109 $25 Not Implemented
IA0395 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,347 $11,263 Implemented
IA0395 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,322 $27,832 Implemented
IA0395 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $751 $0 Implemented
IA0395 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,776 $672 Implemented
IA0395 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,463 $9,500 Not Implemented
IA0393 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,020 $541 Implemented
IA0393 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $578 $5,251 Not Implemented
IA0393 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $762 $0 Implemented
IA0393 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,978 $0 Implemented