IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0212 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,906 $53,007 Not Implemented
IC0212 # 03 Y:2019 03 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,487 $10,350 Not Implemented
IP0115 # 01 Y:2019 01 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,898 $1,950 Implemented
IP0115 # 02 Y:2019 02 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $188 $500 Implemented
IP0115 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,936 $6,650 Implemented
IP0114 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,085 $0 Not Implemented
IP0114 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $591 $0 Not Implemented
IP0114 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $245 $10 Implemented
IP0114 # 04 Y:2019 04 2019 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,320 $480 Not Implemented
IP0114 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,093 $150 Implemented
IP0114 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $681 $680 Not Implemented
IP0114 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,152 $20,160 Implemented
IP0114 # 08 Y:2019 08 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,040 $4,200 Not Implemented
IC0211 # 01 Y:2019 01 2019 USE RADIANT HEATER FOR SPOT HEATING $5,999 $9,168 Not Implemented
IC0211 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,310 $18,709 Implemented
IC0211 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,768 $42,206 Implemented
IC0211 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,829 $4,500 Implemented
IC0211 # 05 Y:2019 05 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,922 $0 Implemented
IP0113 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,753 $0 Not Implemented
IP0113 # 02 Y:2019 02 2019 COMBINE UTILITY METERS $1,625 $0 Not Implemented
IP0113 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,595 $4 Not Implemented
IP0113 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $783 $0 Not Implemented
IP0113 # 05 Y:2019 05 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $629 $0 Not Implemented
IP0113 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,196 $72 Implemented
IP0113 # 07 Y:2019 07 2019 USE PHOTOCELL CONTROLS $151 $71 Implemented