IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0716 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $-28,676 $0 Not Implemented
OK0716 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $1,725 $125 Not Implemented
OK0716 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $212 $475 Not Implemented
OK0716 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $579 $25 Not Implemented
OK0716 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $153 $1,346 Not Implemented
SD0371 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,113 $52 Not Implemented
SD0371 # 02 Y:2005 02 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $17,251 $3,850 Not Implemented
SD0371 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,329 $6,950 Not Implemented
SD0371 # 04 Y:2005 04 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,944 $12,000 Not Implemented
SD0371 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,710 $140 Implemented
SD0371 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,914 $648 Not Implemented
SD0371 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,559 $55,084 Not Implemented
SD0371 # 08 Y:2005 08 2005 USE POWER DURING OFF-PEAK PERIODS $31,048 $0 Not Implemented
UD0729 # 01 Y:2005 01 2005 DEVELOP STANDARD OPERATING PROCEDURES $256,000 $110,000 Not Implemented
UD0729 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $113,219 $13,700 Not Implemented
UD0729 # 03 Y:2005 03 2005 USE PHOTOCELL CONTROLS $99,594 $0 Not Implemented
UD0729 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,514 $0 Not Implemented
UD0729 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $19,115 $0 Implemented
UD0729 # 06 Y:2005 06 2005 UPGRADE CONTROLS ON COMPRESSORS $11,374 $1,725 Implemented
UD0729 # 07 Y:2005 07 2005 DISCONNECT BALLASTS $8,190 $2,250 Implemented
UD0729 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,187 $4,650 Not Implemented
UD0729 # 09 Y:2005 09 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,422 $0 Not Implemented
UD0729 # 10 Y:2005 10 2005 INSULATE BARE EQUIPMENT $487 $0 Implemented
MI0119 # 01 Y:2005 01 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,064 $170 Implemented
MI0119 # 02 Y:2005 02 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,450 $96 Implemented