IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84,208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0234 # 09 Y:2002 09 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $712 $758 Not Implemented
WV0234 # 10 Y:2002 10 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,260 $1,342 Not Implemented
WV0234 # 11 Y:2002 11 2002 CLEAR AND RENT EXISTING SPACE $7,300 $1,160 Implemented
WV0234 # 12 Y:2002 12 2002 CLEAR AND RENT EXISTING SPACE $50,000 $1,500 Not Implemented
NC0229 # 01 Y:2002 01 2002 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $51,728 $50,000 Implemented
NC0229 # 02 Y:2002 02 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $55,158 $15,000 Implemented
NC0229 # 03 Y:2002 03 2002 KEEP EQUIPMENT CLEAN $21,155 $1,000 Implemented
NC0229 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $5,620 $1,577 Not Implemented
NC0229 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $6,444 $6,536 Not Implemented
NC0229 # 06 Y:2002 06 2002 DEVELOP A REPAIR/REPLACE POLICY $2,372 $2,996 Implemented
NC0229 # 07 Y:2002 07 2002 USE OPTIMUM THICKNESS INSULATION $298 $860 Not Implemented
NC0229 # 08 Y:2002 08 2002 USE PHOTOCELL CONTROLS $260 $300 Implemented
GT0728 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,492 $750 Implemented
GT0728 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,952 $6,346 Implemented
GT0728 # 03 Y:2002 03 2002 MAINTAIN MACHINES TO REDUCE LEAKS $2,765 $3,150 Not Implemented
GT0728 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,916 $0 Implemented
GT0728 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $2,356 $1,555 Not Implemented
BD0205 # 01 Y:2002 01 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $133,965 $75,270 Not Implemented
BD0205 # 02 Y:2002 02 2002 USE RADIANT HEATER FOR SPOT HEATING $25,105 $60,000 Not Implemented
BD0205 # 03 Y:2002 03 2002 INSTALL AUTOMATIC STACK DAMPER $4,550 $5,000 Not Implemented
BD0205 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,089 $4,800 Implemented
BD0205 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,003 $1,000 Implemented
BD0205 # 06 Y:2002 06 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,411 $1,500 Not Implemented
BD0205 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,387 $300 Implemented
BD0205 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $1,324 $1,425 Not Implemented