IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0141 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,091 $2,522 Implemented
UA0141 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,110 $800 Implemented
UA0141 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,816 $7,363 Not Implemented
UA0141 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,559 $421 Not Implemented
UA0141 # 08 Y:2015 08 2015 INSTALL TIMERS AND/OR THERMOSTATS $620 $250 Implemented
UA0140 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,066 $277,510 Not Implemented
UA0140 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $105,613 $6,000 Not Implemented
UA0140 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,787 $1,522 Implemented
UA0140 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $54,259 $61,169 Not Implemented
UA0140 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,564 $1,260 Implemented
UA0140 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,524 $10,992 Not Implemented
UA0139 # 01 Y:2015 01 2015 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $63,096 $121,500 Not Implemented
UA0139 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $45,863 $7,500 Not Implemented
UA0139 # 03 Y:2015 03 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $43,191 $40,000 Not Implemented
UA0139 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $23,276 $3,627 Implemented
UA0139 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,428 $2,268 Not Implemented
UA0139 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,395 $800 Implemented
UA0139 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,460 $2,995 Not Implemented
UA0138 # 01 Y:2015 01 2015 BURN A LESS EXPENSIVE GRADE OF FUEL $27,518 $0 Not Implemented
UA0138 # 02 Y:2015 02 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $671 $658 Not Implemented
UA0138 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $3,174 $3,210 Not Implemented
UA0138 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,270 $3,920 Not Implemented
UA0138 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $557 $186 Not Implemented
UA0136 # 01 Y:2015 01 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $62,198 $11,224 Not Implemented
UA0136 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,296 $22,500 Not Implemented