IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0657 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,401 $480 Implemented
MA0657 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $2,125 $7,500 Not Implemented
MA0657 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,635 $2,400 Implemented
MA0654 # 01 Y:2009 01 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $22,566 $39,500 Not Implemented
MA0654 # 02 Y:2009 02 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,750 $30,000 Implemented
MA0654 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,377 $18,330 Implemented
MA0654 # 04 Y:2009 04 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,876 $9,840 Not Implemented
MA0653 # 01 Y:2009 01 2009 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $110,550 $270,000 Not Implemented
MA0653 # 02 Y:2009 02 2009 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $37,210 $68,000 Not Implemented
MA0653 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $16,188 $752 Implemented
MA0653 # 04 Y:2009 04 2009 CLOSE OFF UNNEEDED STEAM LINES $3,551 $500 Not Implemented
MA0653 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $2,840 $7,510 Implemented
MA0653 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,375 $6,125 Not Implemented
MA0648 # 01 Y:2009 01 2009 RECOVER WASTE HEAT FROM EQUIPMENT $30,103 $31,813 Not Implemented
MA0648 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $54,137 $59,160 Not Implemented
MA0648 # 03 Y:2009 03 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,829 $50,000 Not Implemented
MA0648 # 04 Y:2009 04 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $36,798 $150,000 Implemented
MA0648 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,052 $6,000 Not Implemented
MA0648 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,937 $15,375 Not Implemented
MA0648 # 07 Y:2009 07 2009 COVER OPEN TANKS $5,857 $1,924 Implemented
MA0645 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $6,990 $0 Implemented
MA0645 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,047 $0 Implemented
MA0645 # 03 Y:2009 03 2009 OPTIMIZE PLANT POWER FACTOR $531 $2,665 Not Implemented
MA0644 # 01 Y:2009 01 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $34,492 $160,000 Implemented
MA0644 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,900 $0 Implemented