IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,193

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0447 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,906 $1,000 Implemented
UM0447 # 05 Y:2014 05 2014 REPLACE BOILER $33,249 $3,000 Not Implemented
UM0446 # 01 Y:2014 01 2014 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $166,000 $500,000 Not Implemented
UM0446 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,060 $9,750 Not Implemented
UM0446 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,150 $2,500 Not Implemented
UM0446 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $28,000 $50,000 Not Implemented
UM0446 # 05 Y:2014 05 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,800 $40,000 Not Implemented
UM0446 # 06 Y:2014 06 2014 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $11,000 $4,000 Not Implemented
UM0445 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $790 $500 Not Implemented
UM0445 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,158 $24,137 Not Implemented
UM0445 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $515 $2,300 Not Implemented
UM0445 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $118 $500 Implemented
UM0444 # 01 Y:2014 01 2014 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $216,000 $500,000 Not Implemented
UM0444 # 02 Y:2014 02 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $71,820 $133,000 Not Implemented
UM0444 # 03 Y:2014 03 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $67,306 $80,000 Not Implemented
UM0444 # 04 Y:2014 04 2014 USE MINIMUM STEAM OPERATING PRESSURE $6,638 $5,000 Implemented
UM0444 # 05 Y:2014 05 2014 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $104,300 $208,000 Not Implemented
UM0442 # 01 Y:2014 01 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $143,338 $477,600 Not Implemented
UM0442 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,315 $40,000 Implemented
UM0442 # 03 Y:2014 03 2014 USE MINIMUM STEAM OPERATING PRESSURE $10,229 $5,000 Implemented
UM0442 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $4,900 $3,000 Implemented
UM0440 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,365 $500 Implemented
UM0440 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,543 $6,000 Implemented
UM0440 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,152 $2,500 Implemented
UM0440 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,534 $1,500 Implemented