IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,224

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0581 # 04 Y:1996 04 1996 USE MINIMUM STEAM OPERATING PRESSURE $2,360 $2,600 Not Implemented
TN0581 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,600 $0 Not Implemented
TN0581 # 06 Y:1996 06 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $455 $0 Implemented
TN0580 # 01 Y:1996 01 1996 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $18,501 $38,600 Not Implemented
TN0580 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,167 $5,110 Implemented
TN0580 # 03 Y:1996 03 1996 INSTALL TIMERS AND/OR THERMOSTATS $3,848 $520 Implemented
TN0580 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $811 $394 Not Implemented
TN0580 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $278 $170 Not Implemented
TN0568 # 01 Y:1996 01 1996 CONVERT TO AQUEOUS CLEANING SYSTEM $34,986 $10,700 Implemented
TN0568 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,602 $13,880 Implemented
TN0568 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,795 $13,800 Implemented
TN0568 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,810 $11,100 Not Implemented
TN0568 # 05 Y:1996 05 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,810 $8,400 Not Implemented
TN0568 # 06 Y:1996 06 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,739 $5,200 Not Implemented
TN0568 # 07 Y:1996 07 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $277 $0 Not Implemented
GT0567 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,700 $900 Implemented
GT0567 # 02 Y:1995 02 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,500 $16,500 Not Implemented
GT0567 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,990 $145 Implemented
GT0567 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,340 $38,280 Implemented
GT0567 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,420 $45,060 Implemented
GT0567 # 06 Y:1995 06 1995 REPAIR AND ELIMINATE STEAM LEAKS $6,860 $700 Implemented
GT0567 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $58,060 $37,200 Implemented
GT0567 # 08 Y:1995 08 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $1,650 $0 Implemented
GT0567 # 09 Y:1995 09 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $186,200 $100,000 Implemented
TN0564 # 01 Y:1995 01 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,299 $15,600 Not Implemented