Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0532 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,060 | $12,170 | Implemented |
KU0532 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $700 | $450 | Implemented |
KU0532 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $260 | $360 | Implemented |
KU0532 # 06 Y:1999 | 06 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $9,410 | $14,000 | Not Implemented |
KU0532 # 07 Y:1999 | 07 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $12,150 | $11,640 | Not Implemented |
KU0532 # 08 Y:1999 | 08 | 1999 | RECYCLE CLEANING SOLVENT AND REUSE | $2,620 | $800 | Implemented |
CO0452 # 05 Y:1999 | 05 | 1999 | USE A RAG RECYCLE SERVICE | $350 | $0 | n/a |
CO0452 # 06 Y:1999 | 06 | 1999 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $140 | $0 | n/a |
CO0452 # 07 Y:1999 | 07 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $130 | $0 | n/a |
CO0452 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,650 | $5,000 | n/a |
CO0452 # 02 Y:1999 | 02 | 1999 | REDUCE VENTILATION AIR | $1,860 | $1,000 | n/a |
CO0452 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $310 | $290 | n/a |
CO0452 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10 | $0 | n/a |
KU0531 # 01 Y:1999 | 01 | 1999 | OPTIMIZE PLANT POWER FACTOR | $8,350 | $9,600 | Not Implemented |
KU0531 # 02 Y:1999 | 02 | 1999 | USE SYNTHETIC LUBRICANT | $2,350 | $3,690 | Not Implemented |
KU0531 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,520 | $2,670 | Not Implemented |
KU0531 # 04 Y:1999 | 04 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,370 | $110 | Not Implemented |
KU0531 # 05 Y:1999 | 05 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $600 | $0 | Not Implemented |
KU0531 # 06 Y:1999 | 06 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $91,030 | $325,000 | Not Implemented |
KU0530 # 01 Y:1999 | 01 | 1999 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,910 | $8,800 | n/a |
KU0530 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $900 | $520 | n/a |
KU0530 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $620 | $730 | n/a |
KU0530 # 04 Y:1999 | 04 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $55,080 | $1,380 | n/a |
KU0530 # 05 Y:1999 | 05 | 1999 | IMPROVE SPACE COMFORT CONDITIONING | $11,600 | $10,670 | n/a |
MA0447 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,407 | $19,500 | Not Implemented |