IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0104 # 08 Y:2017 08 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,363 $968 Not Implemented
BS0104 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $338 $198 Not Implemented
BS0104 # 10 Y:2017 10 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,506 $20,241 Not Implemented
WV0552 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $108,472 $401,920 Not Implemented
WV0552 # 02 Y:2017 02 2017 USE POWER DURING OFF-PEAK PERIODS $17,322 $2,500 Implemented
WV0552 # 03 Y:2017 03 2017 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $14,015 $46,500 Not Implemented
WV0552 # 04 Y:2017 04 2017 DEVELOP A REPAIR/REPLACE POLICY $13,726 $620 Not Implemented
WV0552 # 05 Y:2017 05 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,424 $1,000 Implemented
WV0552 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,201 $10,486 Implemented
WV0552 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,913 $3,240 Implemented
AS0444 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $33,358 $4,325 Not Implemented
AS0444 # 02 Y:2017 02 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,643 $872 Implemented
AS0444 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,007 $100 Implemented
AS0444 # 04 Y:2017 04 2017 INSTALL SKYLIGHTS $1,596 $1,633 Not Implemented
BS0104 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $120,755 $55,860 Not Implemented
NC0600 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,705 $10,366 Implemented
NC0600 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $191 $850 Implemented
NC0600 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $383 $200 Implemented
NC0600 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $650 $1,200 Implemented
NC0600 # 05 Y:2017 05 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,798 $500 Not Implemented
NL0011 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,874 $0 Not Implemented
NL0011 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,747 $20,139 Implemented
NL0011 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,135 $1,571 Not Implemented
NL0011 # 04 Y:2017 04 2017 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $982 $0 Implemented
LS0005 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $69,401 $106,209 Not Implemented