Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0187 # 03 Y:1986 | 03 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $489 | $488 | Implemented |
UD0188 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,133 | $13,400 | Implemented |
UD0188 # 02 Y:1986 | 02 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,279 | $0 | Not Implemented |
UD0189 # 01 Y:1986 | 01 | 1986 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $4,104 | $0 | Not Implemented |
UD0189 # 02 Y:1986 | 02 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $952 | $0 | Implemented |
UD0189 # 03 Y:1986 | 03 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,061 | $5,112 | Implemented |
UD0186 # 01 Y:1986 | 01 | 1986 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,459 | $0 | Implemented |
UD0186 # 02 Y:1986 | 02 | 1986 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $4,586 | $2,812 | Not Implemented |
UD0186 # 03 Y:1986 | 03 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,369 | $26,000 | Implemented |
UD0183 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,945 | $575 | Implemented |
UD0184 # 01 Y:1985 | 01 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,933 | $4,480 | Not Implemented |
UD0184 # 02 Y:1985 | 02 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,473 | $10,670 | Implemented |
UD0184 # 03 Y:1985 | 03 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,968 | $0 | Implemented |
UD0185 # 01 Y:1985 | 01 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $33,827 | $54,000 | Implemented |
UD0185 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,629 | $30,202 | Implemented |
UD0185 # 03 Y:1985 | 03 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,108 | $5,100 | Not Implemented |
UD0185 # 04 Y:1985 | 04 | 1985 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $3,556 | $9,700 | Not Implemented |
UD0180 # 01 Y:1985 | 01 | 1985 | REDESIGN PROCESS | $5,475 | $0 | Implemented |
UD0180 # 02 Y:1985 | 02 | 1985 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $2,995 | $10,000 | Implemented |
UD0180 # 03 Y:1985 | 03 | 1985 | REPAIR OR REPLACE STEAM TRAPS | $1,559 | $2,500 | Implemented |
UD0180 # 04 Y:1985 | 04 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,008 | $4,000 | Implemented |
UD0180 # 05 Y:1985 | 05 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $657 | $700 | Implemented |
UD0180 # 06 Y:1985 | 06 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,822 | $0 | Not Implemented |
UD0181 # 01 Y:1985 | 01 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,612 | $200 | Implemented |
UD0181 # 02 Y:1985 | 02 | 1985 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,753 | $700 | Implemented |