IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0217 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,202 $4,000 Not Implemented
LE0217 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,764 $900 Implemented
LE0217 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,158 $900 Implemented
LE0217 # 08 Y:2005 08 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,372 $263 Implemented
LE0217 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,389 $240 Not Implemented
LE0217 # 10 Y:2005 10 2005 INSTALL OCCUPANCY SENSORS $874 $150 Not Implemented
LE0211 # 01 Y:2005 01 2005 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $52,318 $23,385 Implemented
LE0211 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $23,185 $7,550 Not Implemented
LE0211 # 03 Y:2005 03 2005 USE RADIANT HEATER FOR SPOT HEATING $19,652 $12,710 Not Implemented
LE0211 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,558 $3,000 Not Implemented
LE0211 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,348 $2,355 Not Implemented
LE0211 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,667 $1,070 Not Implemented
LE0211 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,128 $16,472 Implemented
LE0211 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $384 $300 Not Implemented
LE0206 # 01 Y:2005 01 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $135,669 $50,000 Not Implemented
LE0206 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,193 $5,000 Implemented
LE0206 # 03 Y:2005 03 2005 INSTALL BACK-UP EQUIPMENT $11,880 $14,100 Implemented
LE0206 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,905 $2,500 Not Implemented
LE0206 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,894 $2,200 Not Implemented
LE0206 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $683 $200 Implemented
LE0206 # 07 Y:2005 07 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $63,361 $382,500 Not Implemented
LE0205 # 01 Y:2005 01 2005 INSTALL BACK-UP EQUIPMENT $65,962 $35,000 Implemented
LE0205 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,462 $15,000 Not Implemented
LE0205 # 03 Y:2005 03 2005 OPTIMIZE PLANT POWER FACTOR $4,673 $5,050 Not Implemented
LE0205 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,294 $2,500 Implemented