Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0561 # 08 Y:2020 | 08 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,057 | $930 | Implemented |
UF0561 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,043 | $0 | Implemented |
UF0561 # 10 Y:2020 | 10 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,816 | $421 | Implemented |
UF0561 # 11 Y:2020 | 11 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,418 | $5,192 | Implemented |
UF0561 # 12 Y:2020 | 12 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $854 | $800 | Implemented |
UF0561 # 13 Y:2020 | 13 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $624 | $0 | Implemented |
UF0560 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,999 | $359,360 | Not Implemented |
UF0560 # 02 Y:2020 | 02 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,454 | $5,998 | Implemented |
UF0560 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $3,072 | $8,274 | Not Implemented |
UF0560 # 04 Y:2020 | 04 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,897 | $1,544 | Implemented |
UF0560 # 05 Y:2020 | 05 | 2020 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,841 | $378 | Implemented |
UF0560 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,156 | $306 | Implemented |
UF0560 # 07 Y:2020 | 07 | 2020 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $134,615 | $11,004 | Not Implemented |
UF0560 # 08 Y:2020 | 08 | 2020 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $9,639 | $725 | Implemented |
MI0382 # 01 Y:2020 | 01 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,223 | $3,645 | Not Implemented |
MI0382 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO HEAT WATER | $7,209 | $8,409 | Not Implemented |
MI0382 # 03 Y:2020 | 03 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $5,430 | $2,740 | Not Implemented |
MI0382 # 04 Y:2020 | 04 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,045 | $1,796 | Not Implemented |
MI0382 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,278 | $3,204 | Implemented |
MI0382 # 06 Y:2020 | 06 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,088 | $1,306 | Not Implemented |
MI0382 # 07 Y:2020 | 07 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $964 | $1,884 | Implemented |
UF0559 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $42,076 | $359,360 | Not Implemented |
UF0559 # 02 Y:2020 | 02 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $19,566 | $32,210 | Implemented |
UF0559 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,767 | $956 | Implemented |
UF0559 # 04 Y:2020 | 04 | 2020 | REPOSITION OVEN WALLS TO REDUCE HEATED SPACE | $3,003 | $750 | Implemented |