IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1007 # 11 Y:2019 11 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,235 $23,550 Implemented
UD1006 # 01 Y:2019 01 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $44,647 $16,500 Implemented
UD1006 # 02 Y:2019 02 2019 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $125,929 $30,000 Not Implemented
UD1006 # 03 Y:2019 03 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $27,201 $54,202 Not Implemented
UD1006 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $50,796 $0 Not Implemented
UD1006 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $8,839 $3,770 Not Implemented
UD1006 # 06 Y:2019 06 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,275 $16,696 Not Implemented
UD1005 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,162 $50 Not Implemented
UD1005 # 02 Y:2019 02 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,649 $700 Not Implemented
UD1005 # 03 Y:2019 03 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,736 $12,025 Not Implemented
UD1005 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,555 $0 Not Implemented
UD1004 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $34,429 $0 Not Implemented
UD1004 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,197 $0 Not Implemented
UD1004 # 03 Y:2019 03 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,185 $0 Not Implemented
UD1004 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,533 $0 Not Implemented
UD1004 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,158 $0 Not Implemented
WV0585 # 01 Y:2019 01 2019 RECYCLE WHITE WATER $175,950 $82,900 Not Implemented
WV0585 # 02 Y:2019 02 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $33,124 $77,800 Not Implemented
WV0585 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $30,373 $10,462 Not Implemented
WV0585 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $18,306 $16,750 Not Implemented
WV0585 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,261 $0 Implemented
WV0585 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,658 $9,998 Implemented
WV0585 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,160 $1,100 Implemented
WV0585 # 08 Y:2019 08 2019 DEVELOP A REPAIR/REPLACE POLICY $5,125 $1,450 Implemented
WV0585 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,529 $250 Not Implemented