IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0009 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,369 $138,420 Not Implemented
UW0009 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,031 $7,140 Implemented
UW0009 # 05 Y:2007 05 2007 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $11,196 $2,080 Not Implemented
UW0009 # 06 Y:2007 06 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $4,114 $3,000 Not Implemented
UW0009 # 07 Y:2007 07 2007 DEVELOP A REPAIR/REPLACE POLICY $3,371 $1,984 Implemented
UW0008 # 01 Y:2007 01 2007 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $136,932 $492,147 Implemented
UW0008 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,830 $81,585 Implemented
UW0008 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,480 $11,244 Implemented
UW0008 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $1,092 $700 Implemented
UW0008 # 05 Y:2007 05 2007 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $231 $650 Not Implemented
UW0007 # 01 Y:2007 01 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,370 $62,800 Implemented
UW0007 # 02 Y:2007 02 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,257 $3,146 Not Implemented
UW0007 # 03 Y:2007 03 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $1,315 $585 Not Implemented
UW0007 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $98 $355 Implemented
UW0006 # 01 Y:2007 01 2007 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $29,806 $4,759 Not Implemented
UW0006 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,096 $1,900 Implemented
UW0006 # 03 Y:2007 03 2007 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $6,191 $10,550 Not Implemented
UW0006 # 04 Y:2007 04 2007 OPTIMIZE PLANT POWER FACTOR $3,834 $12,330 Not Implemented
UW0006 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,403 $4,470 Implemented
UW0006 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $2,289 $3,340 Implemented
UW0006 # 07 Y:2007 07 2007 USE SOLAR HEAT TO HEAT WATER $1,600 $4,450 Not Implemented
UW0006 # 08 Y:2007 08 2007 DEVELOP A REPAIR/REPLACE POLICY $1,318 $597 Implemented
UW0006 # 09 Y:2007 09 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $987 $1,725 Not Implemented
UW0005 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,804 $7,172 Implemented
UW0005 # 02 Y:2007 02 2007 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $15,876 $4,452 Implemented