IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0235 # 03 Y:1998 03 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,571 $939 Not Implemented
AS0235 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $305 Not Implemented
AS0235 # 05 Y:1998 05 1998 INSTALL TIMERS AND/OR THERMOSTATS $294 $375 Not Implemented
AS0235 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $670 $60 Not Implemented
AS0235 # 07 Y:1998 07 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $163 $521 Not Implemented
AS0235 # 08 Y:1998 08 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $45,000 $47,960 Not Implemented
IA0209 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,970 $3,670 Implemented
IA0209 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,774 $871 Implemented
IA0209 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $530 $399 Not Implemented
IA0209 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $255 $50 Not Implemented
IA0209 # 05 Y:1998 05 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $68,734 $2,250 Not Implemented
IA0209 # 06 Y:1998 06 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $6,857 $7,990 Implemented
IA0209 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $115,785 $151,000 Not Implemented
IA0209 # 08 Y:1998 08 1998 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $50,000 $47,669 Not Implemented
NV0116 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $123 $0 Implemented
NV0116 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $808 $200 Implemented
NV0116 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,657 $12,973 Not Implemented
NV0116 # 04 Y:1998 04 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,871 $50,000 Not Implemented
NV0116 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $175 $0 Not Implemented
ME0255 # 01 Y:1998 01 1998 CONTRACT OUT MAINTENANCE $32,242 $75,900 Implemented
ME0255 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,877 $21,500 Not Implemented
ME0255 # 03 Y:1998 03 1998 PURCHASE EQUIPMENT INSTEAD OF LEASING $3,760 $20,100 Not Implemented
ME0255 # 04 Y:1998 04 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,503 $12,300 Not Implemented
ME0255 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,747 $7,023 Implemented
ME0255 # 06 Y:1998 06 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $2,059 $8,900 Not Implemented