IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0216 # 12 Y:2002 12 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,719 $12,000 Not Implemented
BD0216 # 13 Y:2002 13 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $25,880 $25,000 Not Implemented
BD0216 # 14 Y:2002 14 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,000 $1,000 Not Implemented
BD0216 # 15 Y:2002 15 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $300 $120 Not Implemented
IC0041 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,772 $18,245 Implemented
IC0041 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $1,440 Not Implemented
IC0041 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $569 $1,827 Not Implemented
IC0041 # 04 Y:2002 04 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $2,577 $10,720 Not Implemented
IC0041 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,918 $5,000 Implemented
IC0041 # 06 Y:2002 06 2002 RECOVER WASTE HEAT FROM EQUIPMENT $9,358 $8,500 Implemented
IC0041 # 07 Y:2002 07 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $16,000 $8,000 Implemented
IC0041 # 08 Y:2002 08 2002 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $114,000 $335,000 Not Implemented
LE0147 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,429 $900 Implemented
LE0147 # 02 Y:2002 02 2002 REPAIR OR REPLACE STEAM TRAPS $6,177 $4,200 Implemented
LE0147 # 03 Y:2002 03 2002 COMBINE UTILITY METERS $30,000 $1,000 Not Implemented
LE0147 # 04 Y:2002 04 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,478 $750 Implemented
LE0147 # 05 Y:2002 05 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,219 $13,000 Not Implemented
LE0147 # 06 Y:2002 06 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,000 $38,000 Not Implemented
AS0335 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $400 $1,425 Not Implemented
AS0335 # 02 Y:2002 02 2002 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $501 $200 Not Implemented
AS0335 # 03 Y:2002 03 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,394 $32,550 Not Implemented
AS0335 # 04 Y:2002 04 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,813 $0 Not Implemented
AS0335 # 05 Y:2002 05 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,738 $15,320 Not Implemented
IA0301 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $852 $86 Implemented
IA0301 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $380 $104 Not Implemented