Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0343 # 02 Y:2012 | 02 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $167,678 | $90,000 | Not Implemented |
LE0343 # 03 Y:2012 | 03 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $14,506 | $4,200 | Not Implemented |
LE0343 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,536 | $1,000 | Not Implemented |
LE0343 # 05 Y:2012 | 05 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,380 | $6,630 | Not Implemented |
LE0343 # 06 Y:2012 | 06 | 2012 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,932 | $6,000 | Not Implemented |
LE0343 # 07 Y:2012 | 07 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,100 | $16,000 | Not Implemented |
BS0005 # 01 Y:2012 | 01 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $265 | $555 | Not Implemented |
BS0005 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,970 | $609 | Implemented |
BS0005 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,733 | $178 | Implemented |
BS0005 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,615 | $10,000 | Implemented |
BS0005 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,653 | $7,846 | Not Implemented |
BS0005 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $11,990 | $17,000 | Not Implemented |
MAS029 # 01 Y:2012 | 01 | 2012 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,149 | $500 | Implemented |
MAS029 # 02 Y:2012 | 02 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $12,915 | $22,500 | Not Implemented |
MAS029 # 03 Y:2012 | 03 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $8,202 | $22,100 | Not Implemented |
MAS029 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,313 | $4,270 | Implemented |
MAS029 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,392 | $0 | Implemented |
MAS029 # 06 Y:2012 | 06 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,176 | $3,920 | Not Implemented |
LE0345 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $737 | $2,800 | Not Implemented |
LE0345 # 02 Y:2012 | 02 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $16,178 | $750 | Implemented |
LE0345 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,658 | $550 | Implemented |
LE0345 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,195 | $6,750 | Not Implemented |
LE0345 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $21,763 | $3,800 | Implemented |
LE0345 # 06 Y:2012 | 06 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $6,352 | $575 | Not Implemented |
LE0345 # 07 Y:2012 | 07 | 2012 | REPLACE BOILER | $226,873 | $560,000 | Implemented |