IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0343 # 02 Y:2012 02 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $167,678 $90,000 Not Implemented
LE0343 # 03 Y:2012 03 2012 REPAIR OR REPLACE STEAM TRAPS $14,506 $4,200 Not Implemented
LE0343 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,536 $1,000 Not Implemented
LE0343 # 05 Y:2012 05 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,380 $6,630 Not Implemented
LE0343 # 06 Y:2012 06 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,932 $6,000 Not Implemented
LE0343 # 07 Y:2012 07 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,100 $16,000 Not Implemented
BS0005 # 01 Y:2012 01 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $265 $555 Not Implemented
BS0005 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,970 $609 Implemented
BS0005 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,733 $178 Implemented
BS0005 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,615 $10,000 Implemented
BS0005 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,653 $7,846 Not Implemented
BS0005 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $11,990 $17,000 Not Implemented
MAS029 # 01 Y:2012 01 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,149 $500 Implemented
MAS029 # 02 Y:2012 02 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,915 $22,500 Not Implemented
MAS029 # 03 Y:2012 03 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,202 $22,100 Not Implemented
MAS029 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,313 $4,270 Implemented
MAS029 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,392 $0 Implemented
MAS029 # 06 Y:2012 06 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,176 $3,920 Not Implemented
LE0345 # 01 Y:2012 01 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $737 $2,800 Not Implemented
LE0345 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $16,178 $750 Implemented
LE0345 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,658 $550 Implemented
LE0345 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,195 $6,750 Not Implemented
LE0345 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $21,763 $3,800 Implemented
LE0345 # 06 Y:2012 06 2012 INSTALL TIMERS AND/OR THERMOSTATS $6,352 $575 Not Implemented
LE0345 # 07 Y:2012 07 2012 REPLACE BOILER $226,873 $560,000 Implemented