IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0005 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,246 $1,162 Implemented
UW0005 # 04 Y:2007 04 2007 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $8,530 $1,852 Not Implemented
UW0005 # 05 Y:2007 05 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,388 $2,619 Implemented
UW0005 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $6,971 $17,098 Not Implemented
UW0005 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,766 $432 Implemented
UW0005 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,795 $398 Implemented
UW0005 # 09 Y:2007 09 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $354 $650 Not Implemented
UW0003 # 01 Y:2007 01 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,385 $50,000 Not Implemented
UW0003 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $929 $2,100 Implemented
UW0003 # 03 Y:2007 03 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,723 $20,750 Not Implemented
UW0003 # 04 Y:2007 04 2007 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,551 $7,020 Implemented
UW0003 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $905 $1,200 Implemented
UW0004 # 01 Y:2007 01 2007 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $13,962 $8,762 Implemented
UW0004 # 02 Y:2007 02 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,182 $25,800 Implemented
UW0004 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,351 $5,595 Not Implemented
UW0004 # 04 Y:2007 04 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,362 $968 Not Implemented
UW0002 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,263 $85,000 Not Implemented
UW0002 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $10,893 $16,323 Not Implemented
UW0002 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,000 $9,385 Implemented
UW0002 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $5,998 $2,692 Implemented
UW0002 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $252 Implemented
UW0002 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $906 $653 Not Implemented
UW0002 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $153 $200 Implemented
UW0001 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,324 $10,082 Implemented
UW0001 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $7,373 $12,013 Not Implemented