IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0006 # 05 Y:1991 05 1991 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $144,397 $0 Implemented
HO0006 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $138 $173 Implemented
HO0006 # 07 Y:1991 07 1991 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,687 $1,400 Implemented
MA0220 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $2,264 $200 Implemented
MA0220 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $926 $176 Implemented
MA0220 # 03 Y:1991 03 1991 KEEP LAMPS AND REFLECTORS CLEAN $6,561 $13,960 Implemented
MA0220 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $952 $170 Implemented
MA0220 # 05 Y:1991 05 1991 REPAIR OR REPLACE STEAM TRAPS $4,682 $0 Implemented
MA0220 # 06 Y:1991 06 1991 INSTALL STORM WINDOWS AND DOORS $6,712 $50,000 Implemented
MA0220 # 07 Y:1991 07 1991 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,148 $0 Implemented
MA0223 # 01 Y:1991 01 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,884 $1,100 Implemented
MA0223 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $2,810 $220 Implemented
MA0223 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $399 $11,600 Implemented
MA0223 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $532 $265 Not Implemented
MA0223 # 05 Y:1991 05 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,144 $600 Not Implemented
MA0223 # 06 Y:1991 06 1991 AIR CONDITION ONLY SPACE NECESSARY $968 $100 Implemented
MA0223 # 07 Y:1991 07 1991 OPTIMIZE PLANT POWER FACTOR $721 $1,495 Not Implemented
MA0223 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $100 Implemented
MA0224 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $46,881 $0 Not Implemented
MA0224 # 02 Y:1991 02 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $71,552 $0 Not Implemented
MA0224 # 03 Y:1991 03 1991 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $25,667 $19,927 Not Implemented
MA0224 # 04 Y:1991 04 1991 REPAIR OR REPLACE STEAM TRAPS $21,213 $35,000 Implemented
MA0224 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,079 $16,200 Implemented
MA0224 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,765 $1,500 Not Implemented
MA0224 # 07 Y:1991 07 1991 INSULATE BARE EQUIPMENT $1,859 $2,250 Implemented