Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0396 # 05 Y:2006 | 05 | 2006 | DISCONNECT BALLASTS | $810 | $83 | Implemented |
IA0396 # 06 Y:2006 | 06 | 2006 | HEAT WATER WITH EXHAUST HEAT | $57,298 | $18,000 | Not Implemented |
IA0396 # 07 Y:2006 | 07 | 2006 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $6,338 | $500 | Implemented |
IA0396 # 08 Y:2006 | 08 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,234 | $1,702 | Implemented |
IA0396 # 09 Y:2006 | 09 | 2006 | USE MINIMUM STEAM OPERATING PRESSURE | $2,109 | $25 | Not Implemented |
UM0309 # 01 Y:2006 | 01 | 2006 | HEAT WATER WITH EXHAUST HEAT | $292,769 | $50,000 | Not Implemented |
UM0309 # 02 Y:2006 | 02 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $32,329 | $10,600 | Not Implemented |
UM0309 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,830 | $33,667 | Not Implemented |
UM0309 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,143 | $13,000 | Not Implemented |
UM0309 # 05 Y:2006 | 05 | 2006 | INSULATE BARE EQUIPMENT | $4,362 | $7,550 | Not Implemented |
NC0341 # 01 Y:2006 | 01 | 2006 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,414 | $25,000 | Not Implemented |
NC0341 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,082 | $100 | Not Implemented |
NC0341 # 03 Y:2006 | 03 | 2006 | DISCONNECT BALLASTS | $1,454 | $1,650 | Not Implemented |
NC0341 # 04 Y:2006 | 04 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $1,455 | $929 | Not Implemented |
NC0341 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $353 | $100 | Implemented |
NC0341 # 06 Y:2006 | 06 | 2006 | DEVELOP STANDARD OPERATING PROCEDURES | $55,756 | $2,540 | Not Implemented |
CO0589 # 01 Y:2006 | 01 | 2006 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $264,540 | $1,173,000 | Not Implemented |
CO0589 # 02 Y:2006 | 02 | 2006 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $56,580 | $570 | Implemented |
CO0589 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $950 | $500 | Implemented |
CO0589 # 04 Y:2006 | 04 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $23,960 | $0 | Implemented |
CO0589 # 05 Y:2006 | 05 | 2006 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $21,540 | $100,800 | Not Implemented |
CO0589 # 06 Y:2006 | 06 | 2006 | USE SOLAR HEAT TO MAKE ELECTRICTY | $3,910 | $32,600 | Not Implemented |
UU0103 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,610 | $1,995 | Not Implemented |
UU0103 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $560 | $25 | Not Implemented |
UU0103 # 03 Y:2006 | 03 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,760 | $212 | Not Implemented |