Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0093 # 07 Y:2004 | 07 | 2004 | UPGRADE OBSOLETE EQUIPMENT | $1,895 | $8,597 | Not Implemented |
IC0093 # 06 Y:2004 | 06 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $803 | $300 | Not Implemented |
IC0093 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,595 | $34,679 | Not Implemented |
IC0093 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $737 | $0 | Implemented |
IC0093 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,546 | $700 | Implemented |
IC0093 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,864 | $89,448 | Not Implemented |
IC0093 # 01 Y:2004 | 01 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,168 | $3,600 | Implemented |
IC0092 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,934 | $38,438 | Not Implemented |
IC0092 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $1,120 | $3,002 | Not Implemented |
IC0092 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $487 | $1,544 | Not Implemented |
IC0092 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,783 | $17,315 | Not Implemented |
IC0092 # 05 Y:2004 | 05 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,634 | $0 | Not Implemented |
IC0092 # 04 Y:2004 | 04 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $900 | $2,340 | Not Implemented |
IC0092 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $28,152 | $6,700 | Not Implemented |
IC0092 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,325 | $0 | Not Implemented |
IC0092 # 01 Y:2004 | 01 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $4,234 | $30 | Not Implemented |
OR0474 # 06 Y:2004 | 06 | 2004 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,200 | $1,500 | Not Implemented |
OR0474 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,910 | $3,000 | Implemented |
OR0474 # 01 Y:2004 | 01 | 2004 | INCREASE AMOUNT OF CONDENSATE RETURNED | $8,887 | $4,500 | Implemented |
OR0474 # 02 Y:2004 | 02 | 2004 | INCREASE AMOUNT OF CONDENSATE RETURNED | $9,900 | $2,770 | Implemented |
OR0474 # 03 Y:2004 | 03 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,700 | $2,030 | Implemented |
OR0474 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,700 | $5,900 | Implemented |
UU0078 # 01 Y:2004 | 01 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,850 | $10,000 | Not Implemented |
UU0078 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,465 | $405 | Implemented |
UU0078 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,890 | $4,820 | Implemented |