Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0494 # 03 Y:2005 | 03 | 2005 | REDUCE FLUID FLOW RATES | $54,700 | $630 | Implemented |
OR0494 # 02 Y:2005 | 02 | 2005 | REDUCE FLUID FLOW RATES | $63,500 | $0 | Implemented |
OR0494 # 01 Y:2005 | 01 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $77,000 | $0 | Not Implemented |
TA0111 # 07 Y:2005 | 07 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,370 | $10 | Not Implemented |
TA0111 # 06 Y:2005 | 06 | 2005 | DISCONNECT BALLASTS | $1,660 | $140 | Not Implemented |
UU0089 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,700 | $2,000 | Implemented |
UU0089 # 04 Y:2005 | 04 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $33,020 | $2,085 | Not Implemented |
UU0089 # 03 Y:2005 | 03 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,940 | $21,000 | Not Implemented |
UU0089 # 02 Y:2005 | 02 | 2005 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,820 | $1,500 | Not Implemented |
UU0089 # 01 Y:2005 | 01 | 2005 | OPTIMIZE PLANT POWER FACTOR | $1,110 | $4,290 | Implemented |
TA0110 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $969 | $262 | Not Implemented |
TA0110 # 06 Y:2005 | 06 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,362 | $0 | Not Implemented |
TA0110 # 05 Y:2005 | 05 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,083 | $5,319 | Not Implemented |
TA0110 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,880 | $1,080 | Not Implemented |
TA0110 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,925 | $0 | Not Implemented |
TA0110 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $6,850 | $13,700 | Not Implemented |
TA0110 # 01 Y:2005 | 01 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,425 | $0 | Not Implemented |
AS0412 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $37,489 | $5,000 | Implemented |
AS0412 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $37,178 | $15,000 | Implemented |
AS0412 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,601 | $2,000 | Implemented |
AS0412 # 04 Y:2005 | 04 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,470 | $14,400 | Implemented |
AS0412 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,173 | $10,610 | Implemented |
AS0412 # 06 Y:2005 | 06 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $762 | $25 | Implemented |
AS0412 # 07 Y:2005 | 07 | 2005 | USE SOLAR HEAT TO HEAT WATER | $345 | $2,800 | Implemented |
IA0379 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $916 | $1,155 | Not Implemented |