Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0635 # 10 Y:2008 | 10 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,859 | $1,200 | Not Implemented |
MA0635 # 11 Y:2008 | 11 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,035 | $1,600 | Not Implemented |
MA0635 # 12 Y:2008 | 12 | 2008 | USE MINIMUM SAFE OVEN VENTILATION | $880 | $500 | Implemented |
MA0634 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,014 | $119,495 | Implemented |
MA0634 # 02 Y:2008 | 02 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $11,407 | $20,000 | Not Implemented |
MA0634 # 03 Y:2008 | 03 | 2008 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,058 | $3,000 | Not Implemented |
MA0634 # 04 Y:2008 | 04 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,932 | $2,500 | Implemented |
MA0634 # 05 Y:2008 | 05 | 2008 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $1,034 | $6,000 | Not Implemented |
MA0634 # 06 Y:2008 | 06 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $498 | $500 | Implemented |
MA0630 # 01 Y:2008 | 01 | 2008 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $29,594 | $49,500 | Not Implemented |
MA0630 # 02 Y:2008 | 02 | 2008 | USE EXISTING DAM TO GENERATE ELECTRICITY | $22,703 | $72,000 | Not Implemented |
MA0630 # 03 Y:2008 | 03 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,565 | $2,000 | Implemented |
MA0630 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $639 | $300 | Implemented |
MA0630 # 05 Y:2008 | 05 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $407 | $1,944 | Not Implemented |
MA0630 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $189 | $1,300 | Implemented |
MA0629 # 01 Y:2008 | 01 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,363 | $2,800 | Implemented |
MA0629 # 02 Y:2008 | 02 | 2008 | OPTIMIZE PLANT POWER FACTOR | $1,935 | $2,100 | Not Implemented |
MA0629 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,726 | $6,800 | Not Implemented |
MA0629 # 04 Y:2008 | 04 | 2008 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $1,367 | $3,000 | Not Implemented |
MA0629 # 05 Y:2008 | 05 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $450 | $1,620 | Implemented |
MA0629 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $351 | $400 | Implemented |
MA0629 # 07 Y:2008 | 07 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $247 | $200 | Implemented |
MA0625 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,463 | $31,000 | Not Implemented |
MA0625 # 02 Y:2007 | 02 | 2007 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,935 | $8,000 | Implemented |
MA0625 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,861 | $14,400 | Not Implemented |