Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0558 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $14,738 | $120,911 | Implemented |
OR0558 # 05 Y:2010 | 05 | 2010 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,798 | $379,829 | Not Implemented |
OR0558 # 06 Y:2010 | 06 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $930 | $1 | Not Implemented |
OR0557 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,806 | $14,882 | Not Implemented |
OR0557 # 02 Y:2010 | 02 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,866 | $6,763 | Not Implemented |
OR0557 # 03 Y:2010 | 03 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,416 | $500 | Not Implemented |
OR0557 # 04 Y:2010 | 04 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,893 | $3,858 | Not Implemented |
OR0557 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,655 | $1,655 | Not Implemented |
OR0557 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,035 | $3,858 | Not Implemented |
OR0557 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,471 | $1,471 | Not Implemented |
OR0557 # 08 Y:2010 | 08 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $615 | $353 | Not Implemented |
OR0557 # 09 Y:2010 | 09 | 2010 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,079 | $87,827 | Not Implemented |
OR0556 # 01 Y:2010 | 01 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $542 | $0 | Implemented |
OR0556 # 02 Y:2010 | 02 | 2010 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,765 | $0 | Not Implemented |
OR0556 # 03 Y:2010 | 03 | 2010 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $8,900 | $8,900 | Implemented |
OR0556 # 04 Y:2010 | 04 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,987 | $5,125 | Not Implemented |
OR0556 # 05 Y:2010 | 05 | 2010 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $3,131 | $2,861 | Implemented |
OR0556 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,320 | $2,320 | Implemented |
OR0556 # 07 Y:2010 | 07 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,397 | $11,734 | Not Implemented |
OR0556 # 08 Y:2010 | 08 | 2010 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,479 | $65,003 | Not Implemented |
OR0555 # 01 Y:2010 | 01 | 2010 | IMPROVE COMBUSTION CONTROL CAPABILITY | $257,883 | $405,450 | Not Implemented |
OR0555 # 02 Y:2010 | 02 | 2010 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $32,115 | $37,100 | Not Implemented |
OR0555 # 03 Y:2010 | 03 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $15,978 | $11,900 | Implemented |
OR0555 # 04 Y:2010 | 04 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,054 | $1 | Implemented |
OR0554 # 01 Y:2010 | 01 | 2010 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $33,705 | $0 | Implemented |