IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,500

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0320 # 01 Y:2005 01 2005 INSTALL COMMON HEADER ON COMPRESSORS $7,563 $100 Implemented
NC0320 # 02 Y:2005 02 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,200 $100 Not Implemented
NC0320 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,402 $50 Implemented
NC0320 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $193 $421 Implemented
NC0320 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,900 $1,500 Not Implemented
NC0320 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $873 $100 Implemented
NC0320 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $902 $2,000 Implemented
NC0320 # 08 Y:2005 08 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $264 $25 Implemented
WV0322 # 01 Y:2005 01 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $26,224 $142,700 Not Implemented
WV0322 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $22,045 $4,322 Implemented
WV0322 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,250 $468 Implemented
WV0322 # 04 Y:2005 04 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,249 $9,180 Not Implemented
WV0322 # 05 Y:2005 05 2005 USE RADIANT HEATER FOR SPOT HEATING $6,482 $1,500 Not Implemented
WV0322 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,038 $15,738 Implemented
WV0322 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,341 $0 Implemented
WV0322 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,978 $525 Implemented
WV0322 # 09 Y:2005 09 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,045 $160 Not Implemented
WV0322 # 10 Y:2005 10 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,114 $330 Not Implemented
WV0322 # 11 Y:2005 11 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $687 $250 Implemented
WV0322 # 12 Y:2005 12 2005 DEVELOP A REPAIR/REPLACE POLICY $664 $248 Implemented
NC0318 # 01 Y:2005 01 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $39,375 $1,000 Implemented
NC0318 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $11,668 $20,000 Implemented
NC0318 # 03 Y:2005 03 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,275 $18,500 Not Implemented
NC0318 # 04 Y:2005 04 2005 DEVELOP A REPAIR/REPLACE POLICY $443 $585 Implemented
NC0318 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,927 $5,332 Not Implemented