IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0286 # 10 Y:2000 10 2000 MODIFY STARTUP/SHUTDOWN TIMES $567 $120 Not Implemented
AR0192 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $12,065 $11,950 Not Implemented
AR0192 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,251 $1,567 Implemented
AR0192 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,515 $0 Not Implemented
AR0192 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $492 $1,426 Implemented
AR0192 # 05 Y:2000 05 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,496 $24,000 Implemented
AR0192 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $160,000 $45,600 Implemented
KU0549 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $2,352 $150 Not Implemented
KU0549 # 02 Y:2000 02 2000 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $2,132 $3,172 Implemented
SF0200 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,619 $2,800 Not Implemented
SF0200 # 02 Y:2000 02 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,726 $7,750 Not Implemented
SF0200 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,122 $13,280 Not Implemented
SF0200 # 04 Y:2000 04 2000 RECOVER AND REUSE WASTE MATERIAL $24,800 $0 Not Implemented
SF0200 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,728 $70,000 Not Implemented
ND0363 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,021 $8,040 Implemented
ND0363 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,260 $520 Implemented
ND0363 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $189 $380 Not Implemented
ND0363 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $234 $300 Not Implemented
ND0363 # 05 Y:2000 05 2000 PAY UTILITY BILLS ON TIME $1,211 $0 Implemented
ND0364 # 01 Y:2000 01 2000 DEVELOP A REPAIR/REPLACE POLICY $8,340 $22,377 Implemented
ND0364 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,206 $0 Implemented
ND0364 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $839 $600 Not Implemented
ND0364 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $271 $575 Implemented
ND0364 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,221 $1,000 Not Implemented
ND0364 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $75 $200 Implemented