IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0087 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,286 $1,843 Not Implemented
UA0087 # 04 Y:2012 04 2012 INSTALL TIMERS AND/OR THERMOSTATS $10,082 $1,700 Implemented
UA0087 # 05 Y:2012 05 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,599 $3,290 Not Implemented
UA0087 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,878 $1,875 Not Implemented
NC0463 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $15,737 $15,000 Not Implemented
NC0463 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,159 $1,400 Implemented
NC0463 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,208 $200 Implemented
NC0463 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,015 $1,124 Implemented
NC0463 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24 $135 Not Implemented
NC0463 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,367 $5,000 Implemented
MA0701 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,785 $80,000 Not Implemented
MA0701 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $12,823 $24,111 Not Implemented
MA0701 # 03 Y:2012 03 2012 REDUCE VENTILATION AIR $3,642 $6,000 Not Implemented
MA0701 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $9,553 $47,000 Implemented
MA0701 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $7,855 $11,200 Implemented
MA0701 # 06 Y:2012 06 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,286 $500 Implemented
UM0412 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $874 $1,000 Implemented
UM0412 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,308 $2,850 Implemented
UM0412 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $775 $100 Not Implemented
UM0412 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,482 $600 Not Implemented
UM0412 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,923 $1,300 Implemented
UM0412 # 06 Y:2012 06 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,939 $4,000 Not Implemented
UM0411 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,396 $2,000 Not Implemented
UM0411 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,402 $200 Not Implemented
UM0411 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $821 $100 Implemented