Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,738
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0631 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,487 | $400 | Implemented |
OK0631 # 02 Y:2001 | 02 | 2001 | INSULATE BARE EQUIPMENT | $13,831 | $8,000 | Implemented |
OK0631 # 03 Y:2001 | 03 | 2001 | ADD AREA LIGHTING SWITCHES | $1,991 | $194 | Implemented |
OK0631 # 04 Y:2001 | 04 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,478 | $6,067 | Implemented |
OK0631 # 05 Y:2001 | 05 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $174,720 | $364,000 | Implemented |
OK0625 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,900 | $360 | Implemented |
OK0625 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,851 | $84 | Implemented |
OK0625 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $376 | $476 | Implemented |
OK0625 # 04 Y:2001 | 04 | 2001 | INSTALL SET-BACK TIMERS | $2,642 | $1,408 | Not Implemented |
OK0625 # 05 Y:2001 | 05 | 2001 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $868 | $230 | Implemented |
OK0625 # 06 Y:2001 | 06 | 2001 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $39,782 | $95,000 | Implemented |
OK0625 # 07 Y:2001 | 07 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,200 | $30,400 | Implemented |
OK0628 # 01 Y:2001 | 01 | 2001 | INSTALL SET-BACK TIMERS | $8,150 | $310 | Implemented |
OK0628 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $357 | $613 | Implemented |
OK0628 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,940 | $3,013 | Implemented |
OK0628 # 04 Y:2001 | 04 | 2001 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,448 | $1,500 | Implemented |
OK0628 # 05 Y:2001 | 05 | 2001 | INCREASE AMOUNT OF CONDENSATE RETURNED | $39,477 | $20,922 | Implemented |
OK0628 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $75,988 | $752 | Implemented |
OK0628 # 07 Y:2001 | 07 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $20,767 | $5,653 | Not Implemented |
OK0628 # 08 Y:2001 | 08 | 2001 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $456,570 | $93,000 | Not Implemented |
OK0628 # 09 Y:2001 | 09 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $5,452 | $500 | Not Implemented |
OK0628 # 10 Y:2001 | 10 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $42,112 | $100,000 | Not Implemented |
OK0616 # 01 Y:2001 | 01 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $447 | $2,790 | Not Implemented |
OK0616 # 02 Y:2001 | 02 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,570 | $1,040 | Implemented |
OK0616 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,387 | $4,428 | Implemented |