Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,215
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1510 # 07 Y:2015 | 07 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $849 | $0 | Not Implemented |
UK1510 # 08 Y:2015 | 08 | 2015 | USE ONLY CERTIFIED MOTOR REPAIR SHOPS | $623 | $2,031 | Not Implemented |
UK1510 # 09 Y:2015 | 09 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $445 | $650 | Not Implemented |
UK1510 # 10 Y:2015 | 10 | 2015 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $305 | $886 | Not Implemented |
UK1510 # 11 Y:2015 | 11 | 2015 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $427 | $273 | Implemented |
UK1510 # 12 Y:2015 | 12 | 2015 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $310 | $90 | Implemented |
DL0151 # 01 Y:2015 | 01 | 2015 | USE CORRECT SIZE STEAM TRAPS | $12,870 | $2,380 | Not Implemented |
DL0151 # 02 Y:2015 | 02 | 2015 | MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS | $37,680 | $12,400 | Not Implemented |
DL0151 # 03 Y:2015 | 03 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $60,250 | $20,000 | Not Implemented |
DL0151 # 04 Y:2015 | 04 | 2015 | OPERATE BOILERS ON HIGH FIRE SETTING | $10,860 | $4,610 | Not Implemented |
DL0151 # 05 Y:2015 | 05 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $7,730 | $11,520 | Not Implemented |
DL0151 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,550 | $14,400 | Not Implemented |
DL0151 # 07 Y:2015 | 07 | 2015 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,970 | $4,480 | Not Implemented |
DL0151 # 08 Y:2015 | 08 | 2015 | MINIMIZE WATER USAGE | $80,640 | $200,250 | Not Implemented |
NC0554 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,085 | $12,500 | Implemented |
NC0554 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $10,751 | $8,568 | Not Implemented |
NC0554 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,597 | $4,400 | Implemented |
NC0554 # 04 Y:2015 | 04 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,465 | $12,000 | Implemented |
NC0554 # 05 Y:2015 | 05 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $3,916 | $4,500 | Not Implemented |
NC0554 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,384 | $100 | Implemented |
NC0554 # 07 Y:2015 | 07 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,043 | $9,000 | Not Implemented |
NC0554 # 08 Y:2015 | 08 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $147 | $150 | Implemented |
NC0554 # 09 Y:2015 | 09 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $587 | $100 | Not Implemented |
NC0554 # 10 Y:2015 | 10 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $2,829 | $4,258 | Implemented |
SF0474 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,699 | $0 | Implemented |