IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0636 # 02 Y:2002 02 2002 COVER OPEN TANKS $2,412 $528 Not Implemented
OK0636 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $6,525 $1,500 Not Implemented
OK0636 # 04 Y:2002 04 2002 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $175,200 $12,800 Implemented
OK0636 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,410 $1,400 Implemented
OK0636 # 06 Y:2002 06 2002 BURN WOOD BY-PRODUCTS FOR HEAT $15,400 $22,800 Not Implemented
OK0629 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $947 $308 Implemented
OK0629 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,735 $180 Implemented
OK0629 # 03 Y:2001 03 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $193,540 $25,975 Not Implemented
OK0629 # 04 Y:2001 04 2001 AIR CONDITION ONLY SPACE NECESSARY $4,536 $400 Implemented
OK0629 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $190 $0 Not Implemented
OK0629 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $495 $374 Not Implemented
OK0629 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $392 $627 Not Implemented
OK0627 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,445 $200 Not Implemented
OK0627 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,466 $9,056 Implemented
OK0627 # 03 Y:2001 03 2001 INSTALL SET-BACK TIMERS $4,270 $1,050 Not Implemented
OK0627 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,203 $7,500 Not Implemented
OK0627 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $1,194 $1,680 Not Implemented
OK0622 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,626 $2,120 Implemented
OK0622 # 02 Y:2001 02 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,659 $1,089 Implemented
OK0622 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,700 $654 Implemented
OK0622 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,944 $100 Not Implemented
OK0622 # 05 Y:2001 05 2001 INSTALL SET-BACK TIMERS $2,788 $288 Not Implemented
OK0622 # 06 Y:2001 06 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $70,100 $152,055 Implemented
OK0622 # 07 Y:2001 07 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $635,180 $125,000 Implemented
KU0553 # 01 Y:2000 01 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,828 $6,750 Not Implemented