IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0097 # 07 Y:2006 07 2006 INSTALL COMMON HEADER ON COMPRESSORS $1,960 $2,900 Not Implemented
UU0097 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,113 $3,570 Not Implemented
UU0097 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $71,588 $180,000 Not Implemented
UU0092 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $1,130 $1,800 Not Implemented
UU0092 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $740 $280 Not Implemented
UU0092 # 01 Y:2005 01 2005 USE SOY OR WATER-BASED INKS $28,070 $20,000 Not Implemented
UU0092 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,250 $19,000 Not Implemented
UU0092 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,083 $3,270 Not Implemented
UU0089 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $1,110 $4,290 Implemented
UU0089 # 02 Y:2005 02 2005 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,820 $1,500 Not Implemented
UU0089 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,940 $21,000 Not Implemented
UU0089 # 04 Y:2005 04 2005 AIR CONDITION ONLY SPACE NECESSARY $33,020 $2,085 Not Implemented
UU0089 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,700 $2,000 Implemented
UU0096 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $330 Not Implemented
UU0096 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,320 $5,000 Not Implemented
UU0096 # 03 Y:2005 03 2005 USE PHOTOCELL CONTROLS $2,530 $2,040 Not Implemented
UU0096 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,320 $1,950 Not Implemented
UU0096 # 05 Y:2005 05 2005 RECOVER AND REUSE WASTE MATERIAL $9,000 $0 Not Implemented
UU0095 # 01 Y:2005 01 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,360 $2,000 Implemented
UU0095 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,800 $20,000 Not Implemented
UU0095 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,985 $40,000 Not Implemented
UU0095 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $710 $305 Not Implemented
UU0095 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $7,720 $450 Not Implemented
UU0094 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $380 Not Implemented
UU0094 # 02 Y:2005 02 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,260 $7,000 Not Implemented