IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0094 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $370 $220 Not Implemented
UU0094 # 04 Y:2005 04 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,540 $0 Not Implemented
UU0094 # 05 Y:2005 05 2005 USE OPTIMUM THICKNESS INSULATION $110 $150 Not Implemented
UU0088 # 01 Y:2005 01 2005 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $51,720 $68,760 Not Implemented
UU0088 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $703 $6,400 Not Implemented
UU0088 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,915 $900 Not Implemented
UU0088 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $17,670 $19,930 Not Implemented
UU0088 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,940 $30,000 Not Implemented
UU0088 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $15,260 $13,990 Not Implemented
UU0090 # 01 Y:2005 01 2005 AIR CONDITION ONLY SPACE NECESSARY $11,500 $225 Implemented
UU0090 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,520 $4,570 Not Implemented
UU0090 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $4,540 $5,920 Not Implemented
UU0090 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,040 $500 Not Implemented
UU0091 # 01 Y:2005 01 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,270 $7,000 Not Implemented
UU0091 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,360 $420 Not Implemented
UU0091 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $330 $180 Not Implemented
UU0091 # 04 Y:2005 04 2005 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $250 $75 Not Implemented
UU0091 # 05 Y:2005 05 2005 OPTIMIZE PLANT POWER FACTOR $12,500 $15,290 Not Implemented
UU0082 # 01 Y:2005 01 2005 USE CORRECT SIZE STEAM TRAPS $32,790 $20,000 Not Implemented
UU0082 # 02 Y:2005 02 2005 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $36,280 $0 Not Implemented
UU0082 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $784 $4,300 Not Implemented
UU0082 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $786 $600 Not Implemented
UU0082 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,720 $540 Not Implemented
UU0087 # 01 Y:2005 01 2005 EXPAND OPERATIONS INTO UNUSED SPACE $84,030 $200,000 Not Implemented
UU0087 # 02 Y:2005 02 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,270 $0 Not Implemented