IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0258 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $414 $0 Not Implemented
UF0258 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,054 $0 Implemented
UF0258 # 05 Y:2000 05 2000 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $18,176 $0 Implemented
UF0258 # 06 Y:2000 06 2000 METER WASTE WATER $306 $0 Implemented
UF0258 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $14,400 $0 Implemented
NC0197 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $29,525 $15,500 Not Implemented
NC0197 # 02 Y:2000 02 2000 AVOID REWINDING MOTORS MORE THAN TWICE $722 $1,569 Implemented
NC0197 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $1,176 $1,200 Not Implemented
NC0197 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,310 $2,478 Implemented
NC0197 # 05 Y:2000 05 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $8,100 $1,000 Not Implemented
NC0197 # 06 Y:2000 06 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,596 $3,500 Not Implemented
NC0197 # 07 Y:2000 07 2000 ADOPT IN-HOUSE MATERIAL GENERATION $97,778 $1,000 Implemented
UM0172 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $821 $1,000 Not Implemented
UM0172 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,562 $1,200 Implemented
UM0172 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,550 $100 Not Implemented
UM0172 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $791 $500 Implemented
UM0172 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,330 $1,000 Not Implemented
UM0172 # 06 Y:2000 06 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $4,000 $250 Implemented
UM0172 # 07 Y:2000 07 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,500 $3,000 Not Implemented
TN0696 # 01 Y:2000 01 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $184,000 $44,000 Implemented
TN0696 # 02 Y:2000 02 2000 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $182,800 $173,400 Not Implemented
TN0696 # 03 Y:2000 03 2000 MODIFY CURRENT INCENTIVE PROGRAM $78,500 $16,450 Not Implemented
TN0696 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $68,153 $6,800 Implemented
TN0696 # 05 Y:2000 05 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $50,500 $0 Not Implemented
TN0696 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $35,400 $18,900 Implemented