Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0551 # 07 Y:2008 | 07 | 2008 | USE SYNTHETIC LUBRICANT | $2,200 | $0 | Not Implemented |
AM0551 # 08 Y:2008 | 08 | 2008 | INSULATE BARE EQUIPMENT | $580 | $90 | Not Implemented |
AM0551 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $490 | $380 | Implemented |
GT0853 # 01 Y:2008 | 01 | 2008 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $6,045 | $0 | Implemented |
GT0853 # 02 Y:2008 | 02 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,512 | $0 | Not Implemented |
GT0853 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,999 | $4,500 | Implemented |
GT0853 # 04 Y:2008 | 04 | 2008 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $7,123 | $3,000 | Implemented |
GT0853 # 05 Y:2008 | 05 | 2008 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $73,789 | $34,472 | Not Implemented |
GT0853 # 06 Y:2008 | 06 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $46,634 | $55,500 | Not Implemented |
GT0853 # 07 Y:2008 | 07 | 2008 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $10,989 | $8,200 | Not Implemented |
GT0853 # 08 Y:2008 | 08 | 2008 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $1,629 | $2,450 | Implemented |
GT0853 # 09 Y:2008 | 09 | 2008 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $148,679 | $40,000 | Not Implemented |
GT0853 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $128,543 | $230,470 | Implemented |
IA0431 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $723 | $346 | Implemented |
IA0431 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $640 | $12 | Not Implemented |
IA0431 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,028 | $1,014 | Implemented |
IA0431 # 04 Y:2008 | 04 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,300 | $1,300 | Implemented |
IA0431 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,425 | $31,431 | Implemented |
IA0431 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,840 | $4,141 | Implemented |
IA0431 # 07 Y:2008 | 07 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,067 | $1,096 | Not Implemented |
SD0409 # 01 Y:2008 | 01 | 2008 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $36,255 | $192,000 | Not Implemented |
SD0409 # 02 Y:2008 | 02 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,543 | $8,540 | Not Implemented |
SD0409 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,066 | $6,344 | Implemented |
SD0409 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,423 | $6,590 | Implemented |
SD0409 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,387 | $2,539 | Implemented |