IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0149 # 05 Y:2014 05 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $14,550 $28,000 Not Implemented
MZ0149 # 06 Y:2014 06 2014 AIR CONDITION ONLY SPACE NECESSARY $46,961 $5,500 Not Implemented
MZ0146 # 01 Y:2014 01 2014 REDUCE VENTILATION AIR $14,453 $0 Implemented
MZ0146 # 02 Y:2014 02 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $34,621 $0 Implemented
MZ0146 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,588 $2,500 Implemented
MZ0146 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $7,790 $4,375 Not Implemented
MZ0146 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $12,828 $3,375 Not Implemented
MZ0152 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,003 $9,000 Implemented
MZ0152 # 02 Y:2014 02 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $833 $690 Implemented
MZ0152 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,092 $1,160 Implemented
MZ0152 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,587 $1,600 Not Implemented
MZ0152 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $9,287 $9,958 Not Implemented
MZ0152 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $39,777 $37,700 Not Implemented
MZ0145 # 01 Y:2014 01 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $89,896 $277,500 Not Implemented
MZ0145 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $105,420 $300,000 Implemented
MZ0145 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $192,210 $220,000 Implemented
MZ0145 # 04 Y:2014 04 2014 UPGRADE CONTROLS ON COMPRESSORS $113,101 $200,000 Implemented
MZ0145 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $629 $1,000 Not Implemented
MZ0145 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,814 $30,000 Implemented
MZ0145 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,268 $0 Implemented
MZ0145 # 08 Y:2014 08 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,868 $0 Implemented
MZ0145 # 09 Y:2014 09 2014 USE PHOTOCELL CONTROLS $1,686 $2,450 Implemented
MZ0147 # 01 Y:2014 01 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $871 $360 Implemented
MZ0147 # 02 Y:2014 02 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $63 $235 Implemented
MZ0147 # 03 Y:2014 03 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $63 $235 Implemented