IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0696 # 07 Y:2000 07 2000 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $31,500 $0 Not Implemented
TN0696 # 08 Y:2000 08 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $33,720 $5,075 Implemented
KU0548 # 01 Y:2000 01 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,917 $0 n/a
KU0548 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,154 $11,500 n/a
KU0548 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $3,963 $1,505 n/a
KU0548 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,604 $40 n/a
KU0548 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,422 $1,050 n/a
KU0548 # 06 Y:2000 06 2000 MINIMIZE WATER USAGE $4,075 $4,075 n/a
CO0473 # 01 Y:2000 01 2000 IMPROVE COMBUSTION CONTROL CAPABILITY $74,960 $1,050 Implemented
CO0473 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,150 $400 Implemented
CO0473 # 03 Y:2000 03 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,360 $10,000 Implemented
CO0473 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,980 $1,000 Implemented
CO0473 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,180 $6,780 Implemented
CO0473 # 06 Y:2000 06 2000 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,260 $500 Implemented
CO0473 # 07 Y:2000 07 2000 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $107,610 $75,000 Implemented
CO0473 # 08 Y:2000 08 2000 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $39,460 $10,000 Implemented
CO0473 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $587,500 $262,500 Not Implemented
CO0473 # 10 Y:2000 10 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $10,300 $26,000 Not Implemented
DS0174 # 01 Y:2000 01 2000 REDUCE VENTILATION AIR $8,393 $4,500 Implemented
DS0174 # 02 Y:2000 02 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $403 $238 Implemented
DS0174 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $300 $540 Implemented
DS0174 # 04 Y:2000 04 2000 AUTOMATE FINISHING PROCESS $45,038 $6,995 Implemented
DS0174 # 05 Y:2000 05 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $365 $0 Implemented
IA0261 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,574 $8,062 Implemented
IA0261 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,401 $144 Implemented