Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,063
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0076 # 03 Y:2015 | 03 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $4,570 | $16,350 | Not Implemented |
WM0076 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $3,296 | $1,875 | Not Implemented |
WM0076 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,283 | $800 | Not Implemented |
WM0076 # 06 Y:2015 | 06 | 2015 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,055 | $1,000 | Not Implemented |
WM0076 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $867 | $3,330 | Not Implemented |
WM0076 # 08 Y:2015 | 08 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $627 | $2,391 | Not Implemented |
WM0076 # 09 Y:2015 | 09 | 2015 | INSULATE BARE EQUIPMENT | $230 | $77 | Not Implemented |
WM0075 # 01 Y:2015 | 01 | 2015 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $331,900 | $300,000 | Not Implemented |
WM0075 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $68,035 | $93,132 | Not Implemented |
WM0075 # 03 Y:2015 | 03 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $52,881 | $34,000 | Not Implemented |
WM0075 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,819 | $46,125 | Not Implemented |
WM0075 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,025 | $1,280 | Not Implemented |
WM0075 # 06 Y:2015 | 06 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,069 | $852 | Not Implemented |
WM0075 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $1,880 | $330 | Not Implemented |
WM0075 # 08 Y:2015 | 08 | 2015 | INSULATE BARE EQUIPMENT | $2,454 | $1,014 | Not Implemented |
WM0075 # 09 Y:2015 | 09 | 2015 | INSULATE BARE EQUIPMENT | $270 | $495 | Implemented |
WM0075 # 10 Y:2015 | 10 | 2015 | INSTALL OCCUPANCY SENSORS | $151 | $298 | Not Implemented |
WM0071 # 01 Y:2015 | 01 | 2015 | COMBINE UTILITY METERS | $104,990 | $300,000 | Not Implemented |
WM0071 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,586 | $36,000 | Not Implemented |
WM0071 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,236 | $23,560 | Implemented |
WM0071 # 04 Y:2015 | 04 | 2015 | USE SYNTHETIC LUBRICANT | $9,301 | $18,000 | Implemented |
WM0071 # 05 Y:2015 | 05 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,537 | $0 | Implemented |
WM0071 # 06 Y:2015 | 06 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,515 | $7,500 | Not Implemented |
WM0071 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,489 | $1,292 | Not Implemented |
WM0071 # 08 Y:2015 | 08 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,853 | $230 | Not Implemented |