IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0362 # 11 Y:2007 11 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,387 $224 Not Implemented
WV0362 # 12 Y:2007 12 2007 INSULATE BARE EQUIPMENT $1,295 $740 Implemented
WV0362 # 13 Y:2007 13 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $913 $20 Implemented
WV0362 # 14 Y:2007 14 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $297 $400 Implemented
GT0838 # 01 Y:2007 01 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,825 $10,000 Not Implemented
GT0838 # 02 Y:2007 02 2007 USE MINIMUM SAFE OVEN VENTILATION $5,955 $6,000 Not Implemented
GT0838 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $7,976 $0 Not Implemented
GT0838 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,908 $0 Not Implemented
GT0838 # 05 Y:2007 05 2007 USE MINIMUM STEAM OPERATING PRESSURE $17,020 $0 Not Implemented
GT0838 # 06 Y:2007 06 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $1,288 $3,975 Not Implemented
GT0838 # 07 Y:2007 07 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,338 $2,250 Not Implemented
GT0838 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,896 $127,725 Not Implemented
GT0838 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,159 $17,436 Not Implemented
GT0838 # 10 Y:2007 10 2007 INSULATE BARE EQUIPMENT $2,340 $2,004 Not Implemented
GT0837 # 01 Y:2007 01 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $4,990 $0 Implemented
GT0837 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,300 $3,250 Implemented
GT0837 # 03 Y:2007 03 2007 REPAIR AND ELIMINATE STEAM LEAKS $14,528 $1,800 Implemented
GT0837 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $47,920 $0 Implemented
GT0837 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,963 $0 Implemented
GT0837 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,571 $7,090 Implemented
GT0837 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,118 $41,616 Not Implemented
SF0346 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,744 $100 Implemented
SF0346 # 02 Y:2007 02 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $474 $262 Not Implemented
SF0346 # 03 Y:2007 03 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,014 $1,859 Not Implemented
SF0346 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $1,284 $1,620 Not Implemented