IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA3026 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,585 $18,890 Implemented
UA3026 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,558 $27,390 Implemented
UA3026 # 06 Y:2013 06 2013 UPGRADE CONTROLS ON COMPRESSORS $5,142 $300 Not Implemented
UA0100 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $6,757 $1,062 Implemented
UA0100 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,852 $11,493 Not Implemented
UA0100 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,332 $1,800 Implemented
UA0100 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $70 $43 Implemented
UA0097 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $11,720 $2,301 Not Implemented
UA0097 # 02 Y:2013 02 2013 INSTALL TIMERS AND/OR THERMOSTATS $10,770 $3,452 Not Implemented
UA0097 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,628 $18,309 Not Implemented
UA0097 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $3,317 $299 Not Implemented
UA0097 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,163 $1,646 Not Implemented
UA0097 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,219 $2,500 Implemented
UA0098 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $55,414 $35,390 Implemented
UA0098 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $51,977 $20,000 Implemented
UA0098 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,411 $3,500 Implemented
UA0098 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $69,733 $36,138 Not Implemented
UA0098 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,024 $34,540 Not Implemented
UA0098 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,139 $22,860 Not Implemented
UA0095 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,807 $4,500 Not Implemented
UA0095 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,789 $800 Not Implemented
UA0095 # 03 Y:2013 03 2013 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $18,583 $59,040 Not Implemented
UA0095 # 04 Y:2013 04 2013 DISCONNECT BALLASTS $573 $324 Not Implemented
UA0095 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $562 $1,759 Not Implemented
UA0092 # 01 Y:2013 01 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $187,982 $150,000 Not Implemented