IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0655 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,350 $1,122 Implemented
UD0655 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,888 $0 Not Implemented
UD0655 # 04 Y:2002 04 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,492 $500 Not Implemented
UD0655 # 05 Y:2002 05 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,914 $0 Not Implemented
UD0655 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $1,566 $3,665 Not Implemented
UD0655 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $2,418 Implemented
UD0655 # 08 Y:2002 08 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $909 $0 Not Implemented
SD0307 # 01 Y:2002 01 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $115,174 $476,400 Not Implemented
SD0307 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $6,963 $18,000 Not Implemented
SD0307 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,517 $2,500 Not Implemented
SD0307 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $933 $1,200 Not Implemented
SD0307 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $785 $0 Not Implemented
SD0307 # 06 Y:2002 06 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,134 $5,000 Not Implemented
SF0242 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,642 $300 Implemented
SF0242 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,176 $572 Implemented
SF0242 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,518 $1,217 Implemented
SF0242 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,397 $3,036 Not Implemented
SF0242 # 05 Y:2002 05 2002 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $553 $1,000 Not Implemented
SF0242 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $2,020 $3,067 Not Implemented
SF0242 # 07 Y:2002 07 2002 USE PHOTOCELL CONTROLS $433 $1,200 Not Implemented
SF0242 # 08 Y:2002 08 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,216 $16,216 Not Implemented
OK0643 # 01 Y:2002 01 2002 INSTALL SET-BACK TIMERS $3,635 $558 Implemented
OK0643 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $2,012 $3,430 Not Implemented
OK0643 # 03 Y:2002 03 2002 MODIFY WORKLOAD $17,500 $2,500 Not Implemented
OK0643 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $1,163 $1,440 Implemented