IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0346 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,090 $11,740 Not Implemented
SF0346 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,037 $1,863 Not Implemented
SF0346 # 07 Y:2007 07 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $96,586 $193,493 Not Implemented
SF0346 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $721 $1,875 Not Implemented
UA0008 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,588 $63,550 Not Implemented
UA0008 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,848 $0 Implemented
UA0008 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,233 $1,400 Implemented
UA0008 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $1,340 $519 Not Implemented
UA0008 # 05 Y:2007 05 2007 UPGRADE OBSOLETE EQUIPMENT $11,080 $36,000 Not Implemented
UA0008 # 06 Y:2007 06 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $6,248 $200 Implemented
UA0008 # 07 Y:2007 07 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $5,679 $200 Implemented
UA0008 # 08 Y:2007 08 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $51,957 $46,000 Not Implemented
OK0750 # 01 Y:2007 01 2007 INSTALL TIMERS AND/OR THERMOSTATS $6,319 $1,100 Not Implemented
OK0750 # 02 Y:2007 02 2007 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,776 $8,988 Not Implemented
OK0750 # 03 Y:2007 03 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,091 $4,248 Not Implemented
OK0750 # 04 Y:2007 04 2007 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $8,272 $16,000 Not Implemented
OK0750 # 05 Y:2007 05 2007 INSTALL SKYLIGHTS $5,428 $33,634 Not Implemented
OK0750 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,311 $7,391 Not Implemented
OK0750 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,081 $5,998 Not Implemented
OK0750 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,525 $1,000 Not Implemented
OK0750 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,287 $6,522 Not Implemented
OK0750 # 10 Y:2007 10 2007 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,150,588 $195,000 Not Implemented
UW0003 # 01 Y:2007 01 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,385 $50,000 Not Implemented
UW0003 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $929 $2,100 Implemented
UW0003 # 03 Y:2007 03 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,723 $20,750 Not Implemented