IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0367 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $320 $100 Implemented
SU0367 # 06 Y:2014 06 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $913 $646 Not Implemented
SU0367 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $712 $582 Implemented
SU0367 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $3,256 Not Implemented
SU0367 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,775 $6,702 Not Implemented
SU0367 # 10 Y:2014 10 2014 UPGRADE OBSOLETE EQUIPMENT $263 $1,078 Implemented
IA0525 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,330 $730 Implemented
IA0525 # 02 Y:2014 02 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $24,087 $20,750 Not Implemented
IA0525 # 03 Y:2014 03 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,354 $105 Implemented
IA0525 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $846 $1,491 Not Implemented
IA0525 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $584 $687 Implemented
IA0525 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $3,951 $100 Implemented
OK0888 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,503 $1,800 Implemented
OK0888 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,709 $0 Not Implemented
OK0888 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $709 $1,293 Not Implemented
OK0888 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,683 $6,800 Implemented
OK0888 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $843 $1,390 Not Implemented
OK0888 # 06 Y:2014 06 2014 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $6,388 $4,000 Implemented
OK0888 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $52,633 $210,000 Not Implemented
OK0888 # 08 Y:2014 08 2014 USE RADIANT HEATER FOR SPOT HEATING $1,977 $0 Implemented
OK0888 # 09 Y:2014 09 2014 OPTIMIZE PLANT POWER FACTOR $9,969 $6,825 Not Implemented
OK0895 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $829 $689 Not Implemented
OK0895 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $383 $678 Not Implemented
OK0895 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $706 $1,400 Implemented
OK0895 # 04 Y:2014 04 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $669 $1,452 Implemented