Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0990 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,680 | $4,200 | Not Implemented |
UD0990 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $574 | $1,000 | Not Implemented |
UD0990 # 03 Y:2018 | 03 | 2018 | OPTIMIZE PLANT POWER FACTOR | $72,351 | $48,000 | Not Implemented |
UD0990 # 04 Y:2018 | 04 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,458 | $400 | Not Implemented |
UD0990 # 05 Y:2018 | 05 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $2,774 | $10,470 | Not Implemented |
UD0990 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,379 | $200,263 | Not Implemented |
UD0989 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,033 | $0 | Not Implemented |
UD0989 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,291 | $1,000 | Not Implemented |
UD0989 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,012 | $0 | Not Implemented |
UD0989 # 04 Y:2018 | 04 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,885 | $6,000 | Not Implemented |
UD0989 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $1,362 | $1,935 | Not Implemented |
WV0563 # 01 Y:2018 | 01 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $85,272 | $36,000 | Not Implemented |
WV0563 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $83,489 | $54,000 | Not Implemented |
WV0563 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,888 | $173,323 | Not Implemented |
WV0563 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $20,002 | $754 | Implemented |
WV0563 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,206 | $59,750 | Not Implemented |
WV0563 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $1,202 | $1,400 | Implemented |
WV0563 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $264 | $235 | Implemented |
WV0562 # 01 Y:2018 | 01 | 2018 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $284,971 | $600,000 | Not Implemented |
WV0562 # 02 Y:2018 | 02 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,104 | $80,009 | Not Implemented |
WV0562 # 03 Y:2018 | 03 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,359 | $2,000 | Implemented |
WV0562 # 04 Y:2018 | 04 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $10,822 | $0 | Implemented |
WV0562 # 05 Y:2018 | 05 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $6,713 | $703 | Implemented |
WV0562 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $2,979 | $1,328 | Implemented |
WV0562 # 07 Y:2018 | 07 | 2018 | MINIMIZE WATER USAGE | $543 | $2,100 | Implemented |