IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0131 # 07 Y:1995 07 1995 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,226 $11,400 Not Implemented
UF0131 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $845 $350 Implemented
UF0131 # 09 Y:1995 09 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $110,283 $250,000 Not Implemented
UF0131 # 10 Y:1995 10 1995 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $85,495 $8,000 Implemented
SF0071 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $246 $554 Implemented
SF0071 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $1,941 $480 Not Implemented
SF0071 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $665 $970 Implemented
SF0071 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $219 $60 Not Implemented
SF0071 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $116 $0 Implemented
SF0071 # 06 Y:1995 06 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $155 $135 Not Implemented
SF0071 # 07 Y:1995 07 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $474 $100 Implemented
SF0071 # 08 Y:1995 08 1995 INSULATE BARE EQUIPMENT $53 $118 Not Implemented
SF0071 # 09 Y:1995 09 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $556 $400 Implemented
UD0471 # 01 Y:1995 01 1995 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $46,950 $180,000 Implemented
UD0471 # 02 Y:1995 02 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $26,000 $50,000 Implemented
UD0471 # 03 Y:1995 03 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,642 $600 Implemented
UD0471 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,786 $3,320 Implemented
UD0471 # 05 Y:1995 05 1995 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,313 $200 Implemented
UD0471 # 06 Y:1995 06 1995 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $54,000 $7,500 Implemented
CO0344 # 01 Y:1995 01 1995 IMPROVE COMBUSTION CONTROL CAPABILITY $32,610 $165,000 Implemented
CO0344 # 02 Y:1995 02 1995 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $2,980 $2,670 Implemented
CO0344 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,690 $100 Implemented
CO0344 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,660 $5,920 Implemented
CO0344 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,250 $780 Implemented
CO0344 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,110 $2,080 Implemented