Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0006 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $154 | $290 | Not Implemented |
CO0664 # 01 Y:2012 | 01 | 2012 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,690 | $10,600 | Not Implemented |
CO0664 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,660 | $410 | Implemented |
CO0664 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,630 | $8,120 | Implemented |
CO0664 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $1,710 | $2,560 | Not Implemented |
OR0588 # 01 Y:2012 | 01 | 2012 | IMPROVE HANDLING PRACTICES | $7,884 | $60 | Implemented |
OR0588 # 02 Y:2012 | 02 | 2012 | AVOID FROST FORMATION ON EVAPORATORS | $8,968 | $0 | Not Implemented |
OR0588 # 03 Y:2012 | 03 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,021 | $10,000 | Not Implemented |
OR0588 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,053 | $8,053 | Implemented |
OR0588 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $17,738 | $17,500 | Implemented |
OR0588 # 06 Y:2012 | 06 | 2012 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $631 | $4,131 | Not Implemented |
OR0591 # 01 Y:2012 | 01 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $920,649 | $25,909 | Implemented |
OR0591 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $93,821 | $27,749 | Not Implemented |
OR0591 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,274 | $6,968 | Implemented |
OR0587 # 01 Y:2012 | 01 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $11,403 | $11,403 | Not Implemented |
OR0587 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,687 | $1,000 | Not Implemented |
OR0587 # 03 Y:2012 | 03 | 2012 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $15,142 | $6,108 | Not Implemented |
OR0587 # 04 Y:2012 | 04 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,099 | $1,560 | Not Implemented |
OR0587 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $2,854 | $2,854 | Implemented |
OR0587 # 06 Y:2012 | 06 | 2012 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,810 | $9,114 | Not Implemented |
OR0587 # 07 Y:2012 | 07 | 2012 | Install Anaerobic Digester | $75,601 | $294,329 | Not Implemented |
OR0590 # 01 Y:2012 | 01 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,954 | $5,038 | Not Implemented |
OR0590 # 02 Y:2012 | 02 | 2012 | USE OPTIMUM TEMPERATURE | $3,137 | $0 | Implemented |
OR0590 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,188 | $87,787 | Not Implemented |
SD0456 # 01 Y:2012 | 01 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $48,105 | $79,350 | Not Implemented |