Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0517 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,360 | $2,580 | Implemented |
KU0517 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $2,750 | $2,400 | Not Implemented |
KU0517 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,430 | $350 | Implemented |
KU0517 # 04 Y:1999 | 04 | 1999 | INSTALL OCCUPANCY SENSORS | $1,100 | $1,950 | Implemented |
KU0517 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $240 | $250 | Implemented |
KU0517 # 06 Y:1999 | 06 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $42,140 | $99,000 | Not Implemented |
KU0516 # 01 Y:1999 | 01 | 1999 | OPTIMIZE PLANT POWER FACTOR | $17,580 | $24,400 | Implemented |
KU0516 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,520 | $8,930 | Implemented |
KU0516 # 03 Y:1999 | 03 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,490 | $18,930 | Not Implemented |
KU0516 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,770 | $670 | Implemented |
KU0516 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,220 | $870 | Implemented |
KU0516 # 06 Y:1999 | 06 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $7,990 | $5,000 | Not Implemented |
KU0516 # 07 Y:1999 | 07 | 1999 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $1,322,390 | $2,171,500 | Not Implemented |
KU0516 # 08 Y:1999 | 08 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $49,760 | $35,000 | Implemented |
KU0515 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,780 | $400 | Implemented |
KU0515 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,660 | $2,430 | Not Implemented |
KU0515 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $820 | $2,540 | Not Implemented |
KU0515 # 04 Y:1999 | 04 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $530 | $0 | Implemented |
KU0515 # 05 Y:1999 | 05 | 1999 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $3,140 | $7,830 | Implemented |
KU0515 # 06 Y:1999 | 06 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $400,000 | $602,110 | Implemented |
KU0514 # 01 Y:1999 | 01 | 1999 | USE OPTIMUM TEMPERATURE | $25,150 | $9,360 | Implemented |
KU0514 # 02 Y:1999 | 02 | 1999 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,760 | $13,490 | Not Implemented |
KU0514 # 03 Y:1999 | 03 | 1999 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $2,250 | $280 | Implemented |
KU0514 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,950 | $3,040 | Not Implemented |
KU0514 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,300 | $1,960 | Not Implemented |