IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0127 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,188 $228,000 Not Implemented
TT0127 # 03 Y:2014 03 2014 INSTALL COMMON HEADER ON COMPRESSORS $5,171 $25 Not Implemented
TT0127 # 04 Y:2014 04 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $600 $25 Implemented
TT0127 # 05 Y:2014 05 2014 DISCONNECT BALLASTS $390 $130 Implemented
TT0133 # 01 Y:2014 01 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $37,393 $0 Implemented
TT0133 # 02 Y:2014 02 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,930 $0 Implemented
TT0133 # 03 Y:2014 03 2014 DISCONNECT BALLASTS $235 $0 Not Implemented
TT0133 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $35,591 $18,500 Implemented
TT0133 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,060 $1,065 Implemented
TT0133 # 06 Y:2014 06 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,112 $17,178 Implemented
TT0133 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125,381 $357,200 Implemented
TT0133 # 08 Y:2014 08 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $42,310 $281,250 Implemented
TT0126 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $5,874 $24,000 Implemented
TT0126 # 02 Y:2014 02 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,406 $7,500 Implemented
TT0126 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,851 $4,000 Implemented
TT0126 # 04 Y:2014 04 2014 DISCONNECT BALLASTS $346 $110 Implemented
TT0126 # 05 Y:2014 05 2014 INSTALL SPECTRAL REFLECTORS / DELAMP $2,806 $4,900 Implemented
TT0126 # 06 Y:2014 06 2014 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $43,000 $35,238 Not Implemented
TT0128 # 01 Y:2014 01 2014 DISCONNECT BALLASTS $293 $0 Implemented
TT0128 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125 $180 Implemented
TT0128 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $1,294 $1,550 Implemented
TT0128 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,860 $15,980 Implemented
TT0128 # 05 Y:2014 05 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $14,016 $23,710 Implemented
TT0128 # 06 Y:2014 06 2014 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $598 $2,350 Implemented
TT0128 # 07 Y:2014 07 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,636 $18,000 Not Implemented