Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
144,270
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0855 # 06 Y:2023 | 06 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $988 | $385 | n/a |
UF0591 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $460,292 | $1,330,000 | Not Implemented |
UF0591 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $48,128 | $44,635 | Implemented |
UF0591 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,481 | $66,747 | Implemented |
UF0591 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $27,896 | $8,591 | Implemented |
UF0591 # 05 Y:2023 | 05 | 2023 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $12,470 | $19,320 | Implemented |
UF0591 # 06 Y:2023 | 06 | 2023 | INSTALL SUB-METERING EQUIPMENT | $2,168 | $8,880 | Implemented |
UF0591 # 07 Y:2023 | 07 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,713 | $0 | Implemented |
UF0591 # 08 Y:2023 | 08 | 2023 | INSTALL TURBULATORS | $1,724 | $7,500 | Not Implemented |
WM0196 # 05 Y:2023 | 05 | 2023 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $546 | $213 | Implemented |
WM0196 # 06 Y:2023 | 06 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $544 | $240 | Not Implemented |
WM0196 # 07 Y:2023 | 07 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $426 | $1,995 | Implemented |
WM0196 # 08 Y:2023 | 08 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $380 | $0 | Implemented |
WM0196 # 09 Y:2023 | 09 | 2023 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $138 | $125 | Not Implemented |
WM0196 # 10 Y:2023 | 10 | 2023 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $111 | $0 | Not Implemented |
WM0196 # 01 Y:2023 | 01 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,026 | $0 | Implemented |
WM0196 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,584 | $0 | Implemented |
WM0196 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $2,381 | $1,240 | Not Implemented |
WM0196 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,020 | $1,490 | Implemented |
CM1016 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $2,957 | $0 | n/a |
CM1016 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,413 | $6,724 | n/a |
CM1016 # 03 Y:2023 | 03 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $44,187 | $184,569 | n/a |
CM1016 # 04 Y:2023 | 04 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $46,159 | $16,000 | n/a |
GT0964 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $78,169 | $1,850 | Implemented |
GT0964 # 02 Y:2023 | 02 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $142,026 | $175,000 | Not Implemented |