Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0514 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $1,120 | $860 | Implemented |
KU0514 # 07 Y:1999 | 07 | 1999 | MINIMIZE WATER USAGE | $12,240 | $22,300 | Implemented |
KU0514 # 08 Y:1999 | 08 | 1999 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $2,650 | $480 | Not Implemented |
KU0514 # 09 Y:1999 | 09 | 1999 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $490 | $260 | Implemented |
KU0514 # 10 Y:1999 | 10 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $106,720 | $288,000 | Implemented |
KU0513 # 01 Y:1999 | 01 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $166,610 | $85,440 | Implemented |
KU0513 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,800 | $700 | Implemented |
KU0513 # 03 Y:1999 | 03 | 1999 | INSULATE BARE EQUIPMENT | $3,080 | $4,830 | Implemented |
KU0513 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,450 | $1,810 | Not Implemented |
KU0513 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $950 | $1,000 | Implemented |
KU0513 # 06 Y:1999 | 06 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $1,250 | $1,000 | Implemented |
KU0513 # 07 Y:1999 | 07 | 1999 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $23,400 | $61,400 | Implemented |
KU0513 # 08 Y:1999 | 08 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $7,210 | $2,360 | Not Implemented |
KU0512 # 01 Y:1999 | 01 | 1999 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $30,880 | $31,230 | Not Implemented |
KU0512 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,150 | $28,520 | Not Implemented |
KU0512 # 03 Y:1999 | 03 | 1999 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $10,840 | $18,000 | Not Implemented |
KU0512 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,640 | $810 | Not Implemented |
KU0512 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,460 | $270 | Not Implemented |
KU0512 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,120 | $1,800 | Not Implemented |
KU0512 # 07 Y:1999 | 07 | 1999 | INSULATE BARE EQUIPMENT | $1,520 | $1,030 | Not Implemented |
KU0512 # 08 Y:1999 | 08 | 1999 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $990 | $700 | Not Implemented |
KU0512 # 09 Y:1999 | 09 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $550 | $770 | Not Implemented |
KU0512 # 10 Y:1999 | 10 | 1999 | CONVERT TO ELECTROSTATIC POWDER COATING | $278,220 | $513,480 | Not Implemented |
KU0512 # 11 Y:1999 | 11 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $800,000 | $29,240 | Not Implemented |
KU0512 # 12 Y:1999 | 12 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $220,990 | $233,750 | Not Implemented |